Constructability issues can be found using BIM for various trades.
BIM (Building Information Modeling) assists in the review of a construction plan during the pre-construction stage by identifying constructability issues. BIM implementation aids in finding potential stumbling blocks and design flaws that might cause cost overruns and rework. The entire project process is assessed using BIM prior to construction. The entire project, from the initial concept to the finished product, can be examined to identify potential issues caused by incompatible designs, space conflicts, circulation, logistics, and other elements. Revisions and design updates can be tracked throughout the design development of a project. The construction process is streamlined with the aid of BIM MEP BIM Detailer Austin.
Let’s examine how BIM can help different trades address constructability concerns.
Electrical Trade – It’s possible that not all project stakeholders will comprehend and interpret the electrical plans for a significant construction project in their entirety. As a result, construction and rework waste time and resources. Through 3D BIM collaboration, it is effective to bring all project stakeholders to the same page. Managers, field personnel, and other stakeholders can use BIM Constructability Review as a visual tool in this regard. Fast and error-free construction is ensured by the highest level of BIM coordination, which also minimises change orders and rework that are created on the job site. Work stops and installation disruptions are also avoided. The use of bend radius in accordance with codes, mounting heights in accordance with codes, clearance between services, and positioning electrical items in the appropriate location are all constructability issues that BIM in the electrical trade has identified.
Concrete – BIM helps the concrete trade find a number of errors in the input drawings and missing data. Numerous conflicts are discovered that could have affected the cost, availability of resources, and labour requirements for the construction itself. BIM reduces waste by revising designs, including the order of pouring, changing the thickness of the mat slab, blocking off floor openings, and more.
Coordination of HVAC Trade-BIM enables the identification of conflicts and the discussion of them with consultants, which results in design revision. Coordination problems, such as conflicts between flue ducts and other trades, walls, and structures, and more, are resolved through drawing validation. By rerouting ducts, increasing duct size, and altering elevation, clashes are removed from the HVAC model to produce the final version. By prefabricating assemblies in a high-quality manner, installation time, waste, and cost can be reduced.
Prior to construction, request a BIM constructability review and settle any disputes. Constructability review and clash detection analysis frequently use software like Autodesk Design Review, Navisworks, and others. To identify and successfully resolve construction conflicts, choose a qualified BIM service provider. In order to meet building safety standards, BIM visual analysis enables the visualisation of the schedule with the installation of long-term building components and temporary safety measures prior to construction. To perfectly match your construction workflow, implement BIM.